Page 6 - Quarterly Report - Interim Report for the three months ended September 30, 2024
P. 6
At Pindori Lease (operated by POL with a 35% share), 3D seismic data processing is in progress to
evaluate the prospectivity of Chorgali formation and to evaluate the possibility to produce un-drained
oil.
At Tal block (operated by MOL where POL has pre commerciality share of 25%), Makori Deep-3 well
has been approved and well site preparation is in progress.
Adhi South - 9 (operated by Pakistan Petroleum Limited, where POL has 11% share) well has achieved
the target depth, tested and produced 530 barrels of oil per day, 0.6 million cubic feet of gas per day at
flowing wellhead pressure of 175 psi at choke size of 56”. The well has been connected to the
production line.
At Ratana development and production Lease (operated by Orient Petroleum Inc., where POL has
4.54% share), Ratana - 5A has been approved by the Joint Venture Partners.
Exploration blocks
At DG Khan block (operated by POL with a 70% share), gravity magnetic survey will be carried out to
evaluate remaining leads.
North Dhurnal block (operated by POL with 60% share) 3D Seismic data acquisition work has been
started to acquire 285.3 square kilometers.
At Tal block (operated by MOL where POL has pre commerciality share of 25%), the three exploratory
formations were tested in Razgir-1 with commingled production through various choke sizes. The well
achieved the following flow rates:
Condensate: 333 barrels per day
Gas: 25.1 million cubic feet per day
Water: 8 barrels per day
These results were obtained at a wellhead flowing pressure of 3,372 psi, with the flow tested on a
36/64” choke.
Currently, preparations are underway to lay the pipeline necessary for connecting the well to the
production facility.
3D seismic data interpretation of Makori, Makori Deep, Billitang and Kot South has been completed
while seismic interpretation on Kahi North, Sarozai, Sarozai Deep, Manzalai South and Manzalai Deep
leads is in progress.
At Hisal block (operated by PPL where POL has 25% share), 3D seismic acquisition of 235 square
kilometers has been completed. Data processing to carry out the fracture identification study is in
progress.
At Gurgalot block (operated by OGDCL where POL has 20% share), 3D seismic data interpretation
has been completed and subsurface location of Gurgalot X-1 has been finalized, well planning is in
progress.
At Taung block (operated by Mari Petroleum where POL has 40% share), 340.94 square kilometers 3D
Seismic acquisition and interpretation has been completed for the identification of leads.