BUSINESS PROCESS RE-ENGINEERING (BPR)/


           DEVELOPMENT ACTIVITIES






           The Company believes that quality and              Veritas Desktop and Laptop Backup System
           an unyielding commitment to continuous             •   A centralized backup system is being
           improvement are indispensable ingredients to          implemented for protecting data files on
           achieve success. All processes are subject to         desktops and laptops
           continuous evaluation and improvement. Being
           an Oil and Gas Exploration and Production          •   Allows recovery of lost, deleted and malware
           company, research is an essential activity.           damaged files and their versions
                                                              •   Ensures secure encrypted retention of user
           Seismic data acquisition, processing and              data for record and future reference
           interpretation during geophysical activities
           involve selection of optimum data acquisition      POL Process Historian
           parameters through careful experimental            •   Integration of newly upgraded PLC at
           investigation in the field. The Company               Pariwali Processing Facility with POL
           undertakes comprehensive analysis to calculate        Process Historian for data archiving, analysis
           the volume of sub-surface hydrocarbon’s trap of       and remote monitoring
           any area, also uses latest sub-surface imaging     Attendance Machines Upgrade
           technology, before drilling any prospect.          •   2 attendance machines installed and
           Research is also conducted by in-house                upgraded
           and outsourced G&G and reservoir studies.
           Research is also conducted to study to enhance     •   Additional features include face recognition
           and to maintain recovery from the fields.             with Camera Monitoring

           Apart from the drilling of development wells       Local Area Network
           already mentioned earlier by geographical          •   POL Khaur Hospital Data Link Upgrade to
           location the major business development               higher throughput
           projects under taken during the year are as
           follows:                                           •   Industrial Grade network switches for POL
                                                                 Balkassar & Pindori Data Links
           POL IT Up-gradation
                                                              UPS Setup Upgrade
           Human Resource Management System                   •   Upgradation of APC 3KVA UPS Units at POL
           An Online Leave Management Module is                  Meyal LPG Plant, POL Balkassar Exchange
           available for testing in phase 1, this will provide   UPS delivery is awaited
           following features:
                                                              CCTV Monitoring and Control
           •   Online leave submission                        •   POL Pindori CCTV Cameras Installation:
                                                                 Installation of 9 New HD CCTV cameras at
           •   Real-time leave record availability
                                                                 Pindori POLGAS & 6 CCTV cameras at LPG
           •   Privilege Leave record verification               Plant main gate area will start in August 2021

                                                              •   6 Cameras installation at POL Khaur Hospital