Page 60 - Pakistan Oilfields Limited - Annual Report 2021
P. 60

CORPORATE


           SOCIAL RESPONSIBILITY (CSR)





           Helping our                          Tender Meyal in addition to    •   Procurement of new
           Environment                          portable fire water pump.         portable Gas detector for

                                             •   Quarterly Environmental          Balkassar field.
           We are committed to minimize         monitoring of all POL fields   Ongoing/New targets
           and manage   environmental           and SCR rig.                   •   Construction of
           impact of our operational                                              superstructure of new
           activities on our employees,      •   Environment Impact               firetruck for Khaur field in
           contractors, surrounding             Assessment report for             progress through vendor.
           neighborhood and earth’s             Bhandhak and Pirani-1
           resources without affecting          (Kirthar South Block).         •   1st Surveillance audits of ISO
           ecosystem. In view of our         •   3rd party hydro testing of       45001:2018 for Khaur, Meyal,
           continual environment friendly       SCBA and SABA cylinders           Balkassar and SCR Rig.
           activities, POL has achieved         has been carried out.          •   1st Surveillance audits of ISO
           ISO 14001:2015 certification                                           14001:2015 for LPG plant
           for LPG plant site at Meyal.      •   HSE annual awards in all         Meyal.
                                                POL fields/SCR Rig.
           The mitigation measures taken
           to neutralise environmental       •   Environment monitoring        •   Environmental monitoring of
           impact include technology,           (IMC) reports for Pindori         all POL fields and SCR rig.
           up gradation of systems,             Well-10, Turkwal 3-D           •   H2S level-II training through
           increased monitoring level of        Seismic Survey, Balkassar         external trainer.
           environmental parameters,            Deep-1, Jhandial-2.
           applicable legislative controls,                                    •   Process Safety Management
           good industrial practices and     •   Calibration / inspection         training.
           waste management.                    of fixed and portable LEL      •   Conduction of in house first
                                                and H2S gas detection,            aid training at all fields/SCR
           Projects Completed                   flame detection systems,          Rig.
           •   Central recertification of       Automatic foam
               ISO 45001:2018 for Khaur,        suppression system at          •   Assessment of HSE
               Meyal, Balkassar and SCR         fields and SCR Rig.               performance for field’s staff
               in March 2021.                                                     for annual award will be
                                             •   Calibration/ inspection
           •   Recertification Audit of ISO     of Addressable smoke              conducted in all POL fields/
               14001:2015 for LPG Plant         detection system at POL           SCR Rig.
               Meyal.                           House Morgah.                  •   Refurbishment of Fire Tender
                                                                                  (MT-4) of Khaur Field.
           •   Fire Suppression System       •   Hydro testing of fire
               (FM-200) installed at solar      extinguishers DCP-6 and        •   Procurement of SCBA spares
               panel room POL House             DCP-12.                           to take 05 SCBA in service.
               Morgah.
                                             •   NIFT training in sessions     •   Refurbishment of Fire Tender
           •   Complete overhauling and         attended by POL                   (MT-2) of Pindori Field.
               maintenance of Meyal Fire        Employees.
               Tender and installation                                         •   3rd party hydro testing of
               of PTO system in Fire                                              SCBA and SABA cylinder to be
                                                                                  carried out.






       58    PAKISTAN OILFIELDS LIMITED
   55   56   57   58   59   60   61   62   63   64   65