Page 64 - Pakistan Oilfield Limited - Annual Report 2022
P. 64

62
             PAKISTAN OILFIELDS LIMITED
             Directors’ Report
             Business Process Re-engineering


             (BPR) / Development Activities






             The Company                       Seismic data acquisition,        Following functionalities
             believes that quality             processing and interpretation    are available in this LIVE
                                                                                environment:
                                               during geophysical activities
             and an unyielding                 involve selection of optimum data   •   Recovery of lost, deleted and
                                               acquisition parameters through
             commitment                        careful experimental investigation    malware damaged files and
                                                                                     their versions
             to continuous                     in the field. The Company        •    Secured encrypted retention
                                               undertakes comprehensive
             improvement are                   analysis to calculate the volume      of user data for record and
             indispensable                     of sub-surface hydrocarbon’s          future reference
                                               trap of any area, also uses latest
             ingredients to                    sub-surface imaging technology,   Content Management
                                                                                System
                                               before drilling any prospect.
             achieve success.                  Research is also conducted by    •    Development of Work
             All processes                     in-house and outsourced G&G           Request Management
                                               and reservoir studies. Research is
                                                                                     System.
             are subject                       also conducted to enhance and/or   POL Process Historian:
                                               maintain recovery from the fields.
             to continuous                                                      •    Integration of PPL Dhok

             evaluation and                    Apart from drilling of                Sultan Process facility at
                                               development wells already
             improvement. Being                mentioned earlier by                  POL Meyal.
                                               geographical location, major
             an Oil and Gas                    business development projects    Centralized Laboratory
                                                                                Management System – LIMS
             Exploration and                   under taken during the year are   Evaluation of LIMS is in process
                                               as follows:
             Production company,               POL IT Up-gradation              with following features:
             research is an                                                     •    From Sampling to

             essential activity.               Human Resource                        Reporting, all procedural
                                                                                     documentation will be
                                               Management System
                                               Evaluation of existing HRMS           automated
                                               changeover according to new      •    All departmental reports
                                               technology is in process.             including Geology, Drilling,
                                                                                     Process and Engineering
                                               Planned activities are as follows:  •   Trend analysis of all results

                                               •   Application Server /
                                                   Framework                    CCTV Monitoring and
                                               •   HRMS Software                Control
                                                                                •    Installation of CCTV system
                                               Veritas Desktop/Laptop                across POL Meyal Field.
                                               Backup System                    •    CCTV Coverage
                                               A centralized backup system           enhancement at POLGAS
                                               has been implemented and is           Meyal.
                                               functional in LIVE environment.
   59   60   61   62   63   64   65   66   67   68   69